INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Contact US

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Underground FRP piping hydro test pressure

Underground FRP piping hydro test pressure

Underground FRP piping hydro test pressure

(OP)
recomended or  some code hydrotest pressure for gravity and pressure FRP piping

There is a 3500 m long pipe.Recomended length to be tested each time (1.5 m diameter ).To intall headers in each extreme of the pipe or a flange ?

Sorry so many questions

Regards ,


SPLIT

RE: Underground FRP piping hydro test pressure

Normally if the pipes are supplied from Europe  a 1.5 times the working pressure will be required to test the line. In the North american Market a 1.25 times is accepted.

If the pipeline is divided with valves, test between valves after installing test flanges to the the end flanges of the section.

RE: Underground FRP piping hydro test pressure

ISO 14694-4.  That way it is "International" and not European or American.

Steve Jones
Materials & Corrosion Engineer
http://www.pdo.co.om/pdo/

RE: Underground FRP piping hydro test pressure

steve,
      I agree with you about the ISO-14692, but please check this standard and you will find that most GRE pipes produced in USA are not in accordance with the ISO requirments. Check the recommended GRE pipe produced in USA and europe about the recommended hydrotest pressure.

RE: Underground FRP piping hydro test pressure

What difference does it make where the pipe is made?  If ISO 14692 is the quoted specification the the supplier must comply with it.

Steve Jones
Materials & Corrosion Engineer
http://www.pdo.co.om/pdo/

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

Low-Volume Rapid Injection Molding With 3D Printed Molds
Learn methods and guidelines for using stereolithography (SLA) 3D printed molds in the injection molding process to lower costs and lead time. Discover how this hybrid manufacturing process enables on-demand mold fabrication to quickly produce small batches of thermoplastic parts. Download Now
Design for Additive Manufacturing (DfAM)
Examine how the principles of DfAM upend many of the long-standing rules around manufacturability - allowing engineers and designers to place a part’s function at the center of their design considerations. Download Now
Taking Control of Engineering Documents
This ebook covers tips for creating and managing workflows, security best practices and protection of intellectual property, Cloud vs. on-premise software solutions, CAD file management, compliance, and more. Download Now