INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Land subject to flooding

Land subject to flooding

Land subject to flooding

(OP)
I have a piece of property approximately 50-acres which is essentially a valley that slopes down to a culvert (no standing water).  I know that under a 100-yr storm event the property is subject to flooding (approximately 20 ac of the 50 ac is underwater).  

My question is related to the size of the ponded water and how it effects the calculated time of concentration and the CN.

Because the ponded area is fairly large (40% of the subcat.) How do I look at the time of concentration?  Is it from start to culvert? or Start to edge of flooded area? or somewhere in between?
...and as far as the CN value for the land which is pasture that becomes flooded should the pasture CN value be adjuseted to account for the standing water?
Replies continue below

Recommended for you

RE: Land subject to flooding

CN and Tc will not be affected.  Your point of study for the inflow hydrograph is the inlet of the culvert, the point of study for the outflow hydrograph is the outlet of that culvert.  Calc the runoff from the 30-acre contributory subarea as pasture with actual Tc, plus a 20-acre impervious subarea with Tc = 5 minutes to the 20-acre storage volume, then route the stored volume through the culvert.

RE: Land subject to flooding

I agree with LHA regarding the use of CN and TC and modeling part of the site as impervious.  I would consider a level pool routing to analyze the ponding flow attentuation to then determine flows downstream of the culvert.  UNLESS, there is overtopping, in which case it may be appropriate to use the unrouted flows downstream of the culvert (simpler analysis, higher flow rates).

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login



News


Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close