×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Meet Your MVPs for the NFPA (fire) Code Issues forum!

NFPA (fire) Code Issues MVPs
Member Last Reply Votes*
stookeyfpe 22 Sep 20 171
TravisMack 8 Sep 20 134
cdafd 26 Sep 20 103
SprinklerDesigner2 24 Sep 20 66
LCREP 6 Sep 20 49
skdesigner 12 Aug 20 38
pipesnpumps 2 Aug 13 29
FFP1 28 Feb 12 24
NewtonFP 10 Aug 20 17
firepe 1 Dec 11 16
UFT12 25 Sep 20 16
DavidCR 8 Jan 20 15
MatthewJWillis 3 Aug 20 13
rbulsara 12 May 11 13
Sdpaddler50 14 Oct 16 10
NJ1 16 Oct 12 8
b1ueshift 4 Apr 19 7
DRWeig 9 May 18 7
chicopee 24 Mar 20 6
PEDARRIN2 18 Oct 19 6
Arsnman4 31 Aug 16 5
byrnesf 14 Mar 12 5
Oremus 22 Dec 16 5
rbalex 22 Sep 11 5
Cidona 28 May 20 4
dpc 9 Feb 11 4
Duwe6 27 Feb 15 4
FIRESPRINK 7 Mar 17 4
JLSeagull 9 Nov 10 4
kenvlach 7 Aug 07 4
lightecho 26 Mar 14 4
MJCronin 12 Dec 19 4
chillylulu 17 Sep 11 3
DM2 16 Nov 17 3
DonPhillips 9 Jan 09 3
fpst 8 Oct 15 3
IFRs 31 May 20 3
JoeTank 5 Oct 07 3
LowlySprnkLayoutTech 15 Sep 20 3
Mike692 11 Dec 14 3
ryano669 1 Aug 11 3
SprinklerLifer 29 Sep 18 3
stevenal 22 Dec 15 3
bobbyyan 30 Jan 14 2
chaz12 4 Dec 15 2
ChrisConley 7 Apr 11 2
dbaird 11 Nov 10 2
fel3 5 Aug 20 2
FireSprinkler 12 Jul 04 2
FPE22 22 Feb 18 2

* If a member has posted only helpful tips or FAQs, an asterisk will appear in this column.


Resources

White Paper - Addressing Tooling and Casting Requirements at the Design Stage
Several of the tooling and casting requirements of a part can be addressed at the design stage. If these requirements are not addressed at the design stage, lot of time is spent in design iteration when the design reaches the die caster. These design issues lead to increase in time and cost of production leading to delay in time to market and reduced profits for the organization. Download Now
White Paper - The Other Side of Design for Assembly
Assembly level constraints need to be satisfied before the design can move downstream. This white paper will go through the various assembly level issues, which need to be tackled by various organizations on a regular basis. Know more about DFMPro, a design for assembly software. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close