VIRANGA
Geotechnical
- Jan 30, 2017
- 11
This is a relationship between moisture content and dry density. Blue curve is for standard proctor test.( 2.5kg,30cm,3 layers, 27 bowls , in 1L mould = 595.9575kJ/m3) and for red one is like modified proctor test but (4.5kg, 45cm ,5 layers ,35 bowls ,in CBR mould(4L) =896.1046875 kJ/m3 ) . But I expect red one to move left side with moving top . But actualy I got this. What is the reason?