P
prashantshelke
Guest
View attachment 1498
On a global average, 30 percent of engineering effort and time is spent on rework due to late design changes occurring because of downstream manufacturability and design for assembly issues.
Watch this short animated video to learn how you can address manufacturability, assembly , quality, cost and serviceability issues during early design stage with DFMPro.
To know more write to us dfmpro.marketing@geometricglobal.com or call us at +1 (248) 882-7533
On a global average, 30 percent of engineering effort and time is spent on rework due to late design changes occurring because of downstream manufacturability and design for assembly issues.
Watch this short animated video to learn how you can address manufacturability, assembly , quality, cost and serviceability issues during early design stage with DFMPro.
To know more write to us dfmpro.marketing@geometricglobal.com or call us at +1 (248) 882-7533