Twenty or more years ago, when PVC became acceptable for municipal systems, pipe was often deflected more than the manufacturers recommendations, generally at bends, so as to make a little more or less bend. This led to a rash of failures, generally at the fittings and a lot of us in the Pennsylvania area started to spec DI fittings. I guess once burned is enough. The problems were workmanship related but the designer has little control of this, even if his own employees are inspecting.
Steve