Hello my virtual friends and expertise!
We are currently performing feasibility study for the crude oil storage tank terminal and pipeline. In the terminal there will be few storage tanks (more than 30) and a series of pumping station. The required no of pump is series is 13 nos (assuming all pumps are running at the same time without no sparing being adopted YET). The pumps are strictly designed as per API 610 latest ed (12th Ed).
My questions:
1. What's the typical Plant Availability for typical Crude Oil Storage Tank Terminal worldwide?
2. How much is the sparing required that I need to consider to purchase the pumps in order to provide higher availability? Does it N+1 or N+2 or N+3 or ?
Appreciate advice from all of you expert in this fields.
Rgds
We are currently performing feasibility study for the crude oil storage tank terminal and pipeline. In the terminal there will be few storage tanks (more than 30) and a series of pumping station. The required no of pump is series is 13 nos (assuming all pumps are running at the same time without no sparing being adopted YET). The pumps are strictly designed as per API 610 latest ed (12th Ed).
My questions:
1. What's the typical Plant Availability for typical Crude Oil Storage Tank Terminal worldwide?
2. How much is the sparing required that I need to consider to purchase the pumps in order to provide higher availability? Does it N+1 or N+2 or N+3 or ?
Appreciate advice from all of you expert in this fields.
Rgds