OK. So now you have found the necessary codes and regulaitons you have to satisfy.
The most open next step is to set up a full verbal descriptopn of the application (all fluid and flow data, all situations, operational details, opening and closing times, way of operation, numberof operations over time, expected operational time without service, and then ask for a preliminary bid, including (of course) description of all details. Do not forget the trix of asking for suggestions for upped performance valu /better quality valve, at higher cost as an alternative.
If you are not an experiences tgopo expert (none uf us are all the time, for all solutions) it is always better to describe what you want a machine to do, than to try to describe the details of the machine!