I remember a rule of thumb:
Don't weld across a steel joist chord. All welds should be parallel to the length of the joist.
I can't remember how/where I picked up this nugget of knowledge. Can anybody point me in the direction of what authority this is under? (books, code, text, anything)
Thanks
Don't weld across a steel joist chord. All welds should be parallel to the length of the joist.
I can't remember how/where I picked up this nugget of knowledge. Can anybody point me in the direction of what authority this is under? (books, code, text, anything)
Thanks