Hey all, Im designing a cofferdam for the construction of a pad 3.5m x 3.5 m pad foundation, therefore a short term structure. Cofferdam is to be circular. The ground is a fully saturated sitly clay, fairly dense. there is a river about 300m away.
In determining water pressures, my guess is that there will be no significant seepage of water into the excavation during the construction since it is only short term and the permeability is very low.
does this seem a reasonable judgement?
In determining water pressures, my guess is that there will be no significant seepage of water into the excavation during the construction since it is only short term and the permeability is very low.
does this seem a reasonable judgement?