ANSIF
Geotechnical
- Jun 20, 2001
- 42
Dear Colleagues, I wonder if someone can help me to complete de vibratory hammer formula proposed by the U.S. Army Corps of Engineers in its Pile Driving Equipment paper, EI 02G001 01 July 1997. A problem with a font avoids the right reading. Thanks.