nitin5482
Chemical
- Apr 19, 2007
- 3
dear friend,
In our cement plant,We fire coal in the kiln by the burner. in the burner pipe to fed the coal we have design a venturi.
The diagram as below...
coal from wiegh feeder
Hopper
rotary feeder
through venturi in the coal line
but due to some problem, the hopper becomes full & coal started overflowing.
is any one has the solution...
we can not change the size of the hopper..
the change can be made in the speed of rotary feeder & change in venturi design...