This question was asked in a previous thread, but the author never followed up with enough information to close it. I have encountered the same issue on a project.
There are 2 subprojects within the project, 1 is structural fabrication to AWS D1.1 and the 2nd are pipelines to both ASME B31.4 and B31.8.
Is there a time limit on the validity of PQR's?
And my apologies in advance if I've mixed code questions, I know there is an ASME section, but I was hesitant to open 2 threads for the same subject.