farzam, UW-11(a)(5) says if your vessel components are designed using joint efficiencies from Table UW-12 Column (a), you must full RT Cat A & D joints.
UW-11(a)(5)(a) says Cat A & B joints shall be full penetration butt welds.
UW-11(a)(5)(b) says (this is more tricky) that for Cat B & C which intersect the Cat A welds or for joining seamless sections, with an exception for smaller nozzles, must be spot RT'd. The last sentence says this spot RT cannot be used to meet the requirements of UW-52(b)(1) for extent of radiography.
UW-11(a)(5)(b) allows, for example, the use of a joint efficiency of 1 (for a double welded butt joint) for, say, attaching a seamless head to a seamless pipe, as long as one spot RT is performed on this seam.
UW-11(a)(5)(b) also exempts seams in smaller nozzles from the spot RT requirement, for example a pipe to flange buttweld.
Hope you find this useful.