darthsoilsguy2
Geotechnical
- Jul 17, 2008
- 579
Doing a gut renovation on a 3-story residence and have come across a 3/4" plywood subfloor nailed to the 16" o.c joists, but the plywood is not staggered, nor was there any blocking for end seams. Curious what options are on the table to look at here that don't involve ripping out the subfloor or new staggered overlay.