TampaBridgeDesign
Structural
- Mar 8, 2006
- 52
See the link above. This is a corridor running through Salt Lake City on I-80. There were 7 bridges built off site. One by one they'll be moved into place via SPMT. Once they're at the appropriate site they'll be launched out and then lowered into place.