we have two chillers stations,one with three chillers(75 ton/each- two run) and long pipes (3000 meters),and the other circuit with two chillers (75 ton/each - one runs) and short pipes (200 meters) , we want to redesign the pipes to connect these two circuits in one circuit to make more standby units for each side,what is the most considerations we have to care about?(Regard flowrate and pressure drops)
Best regards,
we have two chillers stations,one with three chillers(75 ton/each- two run) and long pipes (3000 meters),and the other circuit with two chillers (75 ton/each - one runs) and short pipes (200 meters) , we want to redesign the pipes to connect these two circuits in one circuit to make more standby units for each side,what is the most considerations we have to care about?(Regard flowrate and pressure drops)