transformer ratings.

Status
Not open for further replies.

Mlmlzx

Electrical
Joined
Feb 3, 2021
Messages
57
Location
NP
Dear All:

For a hydropower plant, calculate the transformer loading for penstock valve house, and surge tank?

regards,
 
Add up the loads.

I’ll see your silver lining and raise you two black clouds. - Protection Operations
 
thanks david, but hwat all electrical loads will required at damsite and at penstock valve house?
 
It depends. Every design is different.

I’ll see your silver lining and raise you two black clouds. - Protection Operations
 
Depends upon capacity of plant and total operating head . . .

Headgate hoist motors.

Security system, including cameras, motion detectors and all-night flood lighting to deter vandalism, if provided [minimal load].

Additional lights for if the operators or maintenance personnel need to see at night [minimal load, if modern high efficiency lights sources are employed; more if incandescent bulbs are used].

If weather goes below freezing: stilling well heaters to ensure headwater elevation measurements remain accurate; gain heaters to ensure headgates will drop in event of triggering of emergency shutdown procedure, instead of being frozen and not dropping, possibly leading to destruction of unit/plant; space heaters to ensure interior temperature of building is maintained at some small nominal value above freezing.