asixth
Structural
- Feb 27, 2008
- 1,333
Hi guys
Is there any way to hold down the top course of a cmu wall. I was anticipating anchoring into the top course as shown.
If you see the attached sketch, I was hoping to provide a U-bar which loops thru the H-block recess of the top course and anchors down into the third course with an plate welded to the end of the reinforcement. Of course, this would create an issue with cover to the U-bar and also grout-filling the cmu would be difficult because of the plate welded to the end of the reinforcement.
My other option would be to provide a raked course to the underside of the roof sheeting so horizontal reinforcement for the second course could be placed with sufficient cover.
Is there any way to hold down the top course of a cmu wall. I was anticipating anchoring into the top course as shown.
If you see the attached sketch, I was hoping to provide a U-bar which loops thru the H-block recess of the top course and anchors down into the third course with an plate welded to the end of the reinforcement. Of course, this would create an issue with cover to the U-bar and also grout-filling the cmu would be difficult because of the plate welded to the end of the reinforcement.
My other option would be to provide a raked course to the underside of the roof sheeting so horizontal reinforcement for the second course could be placed with sufficient cover.