What is the best approach to calculating the tipping force for a stack of multiple items? We have been asked to design some Layup Mandrels that can be stacked on top of each other for the Autoclave. The mandrels are supported by outriggers with extension legs to hold them off the surface below them. It hasn’t been determined how they will move them yet – they just want us to analyze the outriggers for tipping with a stack of 8 (truthfully, it’s the seismic analysis that worries us the most…..).
I have no issue doing an analysis with a single rigid body, but what factors should I include for multiple items stacked on each other? There will be a spud to provide some lateral control, but no means to bind the stack together other than gravity. Any advice is appreciated.