- Oct 27, 2005
- 10
Hi all,
My company does fabricating (Welding, burn, sawing, Brake, Punch, Roll). I am assigned to make a time study on the time it takes to fabricate different parts so that we can make price estimation of future jobs.
We fabricate almost all kinds of shape of steel (A36)and i have no clue where to start from.
Do I measure the time it take for them to cut, break, punch each piece of material? do measure the time in quantities of 5 pieces? There are many more questions..
I would like to ask for some help on how I should go about doing it.
Thank you
koeskoes
My company does fabricating (Welding, burn, sawing, Brake, Punch, Roll). I am assigned to make a time study on the time it takes to fabricate different parts so that we can make price estimation of future jobs.
We fabricate almost all kinds of shape of steel (A36)and i have no clue where to start from.
Do I measure the time it take for them to cut, break, punch each piece of material? do measure the time in quantities of 5 pieces? There are many more questions..
I would like to ask for some help on how I should go about doing it.
Thank you
koeskoes