Hi all
Separate Generator Step up transformer (GSUT, To step up and export power)and Station Services transformer (SST, For plant auxiliary loads)used to be there in almost all power plants.
Generally these two transformers are two winding transformers
To meet the power plant one can use three winding transformer in place of GSUT and SST.
Why most of the power plants will use two two winding transformers instead of one three winding transformer
What might be selection criteria? why design engineering still not changing with change in thoghts of the people or raliability of the equipment.
Separate Generator Step up transformer (GSUT, To step up and export power)and Station Services transformer (SST, For plant auxiliary loads)used to be there in almost all power plants.
Generally these two transformers are two winding transformers
To meet the power plant one can use three winding transformer in place of GSUT and SST.
Why most of the power plants will use two two winding transformers instead of one three winding transformer
What might be selection criteria? why design engineering still not changing with change in thoghts of the people or raliability of the equipment.