Nuke installation subject to radiation over an SG, eh? Nasty environment.
Try very, very hard to NOT "write" or "edit" Code that will fit the Code's unintended purposes. Just over-design it against failure so there is no credible chance of failure.
What about using two tubes of the appropriate designed wall thickness that can be tightly "nested" inside one another, rather than anything with "traditional" pipe wall diameters and thicknesses? Outer tube is the longer for best rigidity, inner tube has the thicker wall and is welded circumferentially at the joint, and also with a series of "plug welds" between outer and inner pipe going up the overlapping portion of the inner pipe for as long as necessary for column stiffness. Pre-drill 2x (or more) holes at right angles to each other for shear pins through the outer pipe.
Adjust the platform height to "perfect" design height, then set the legs to the as-found base conditions with external (temporary) jacking threads.
When welding of the circumferential weld and slot welds completes, drill through the inner pipe and insert the shear pins as backup. Lockweld the shear pins in place.