pls send the reference of this formula. from where it will come.
Ast=(0.5*fck*b*d/fy)*(1-sqrt(1-(4.6*Mu/(fck*b*d*d))
 
Replies continue below

Recommended for you

I haven't done any significant design in concrete for a while, but I've attached a copy of my concrete beam spreadsheet. Is uses the Whitney stress block, and was OK to the Canadian concrete code at the time. I haven't updated it.

[URL unfurl="true"]https://res.cloudinary.com/engineering-com/raw/upload/v1672328742/tips/ConcreteBeam_saug43.xls[/url]

-----*****-----
So strange to see the singularity approaching while the entire planet is rapidly turning into a hellscape. -John Coates

-Dik
 