OK
First go to
Look for downloads, and download "Layout of Power Plant"
Chapter 3 shows the location of the engine sensors
Chapter 6 shows basic p&id
Chapter 7 (fig 7.2) shows the flow diagram of the basic contro, with throttle and mixer. Fig 7.6 shows gas mixer operation.
Chapter 14 refers to electrical systems, including TEM
If yo go to your operators manual, there will be project specific P&ID, there will also be a list of data points in a separate section.
There are several control loops. For example the cooling water inlet to the engine is monitored by a temperature sensor TICA+207. The radiator and heating system valves operate to keep this water at a constant temperature.
For power control, The combustion temperature is monitored by thermocouples in the tcylinder heads. Power is controlled by the throttle position. The mixer operates to maintain the correct combustion temperature corresponding to the actual power.
So it is not easy to give a quick reply here telling how the system works. You really need to talk to MWM, as they do not seem to have a local representative in Egypt.