Lion06
Structural
- Nov 17, 2006
- 4,238
I hate having to post this question because I consider myself pretty good in Excel, but I can't for the life of me figure out how to use a table properly. What I'm trying to do is to have a table with steel beam properties. I would like to have a drop down box such that when I select the beam section from the drop down box the appropriate section properties are referenced. I've followed the tutorial for tables, but it keeps giving me a value error or a reference error. I even made the exact table that is in the example and copied their formulas, but it still isn't working.
Am I just missing a big picture thing here?
Am I just missing a big picture thing here?