nrosin
Civil/Environmental
- May 4, 2010
- 5
I have been worked with swmm5 on a couple of projects now and have been given a drainage plan to do for a subdivision with several ponds. The minor system has been modeled and sized with relative ease based on the 1 in 5 year event. Once the event is switched to the 1 in 100 year many of the nodes surcharge as expected.
The problem is that when I place the parallel conduits for the street flow, in the same manner as the applications guide shows, the EGL drops for some reason and no flow is routed through the street conduits?? At several of the nodes there is considerable flooding then once the additional pipes are put in it is like the excess flow just disappears as if the minor storm system can handle the entire flow with minor surcharging??
Any ideas or suggestions would be greatly appreciated as I am not sure what to do.
Thanks.
The problem is that when I place the parallel conduits for the street flow, in the same manner as the applications guide shows, the EGL drops for some reason and no flow is routed through the street conduits?? At several of the nodes there is considerable flooding then once the additional pipes are put in it is like the excess flow just disappears as if the minor storm system can handle the entire flow with minor surcharging??
Any ideas or suggestions would be greatly appreciated as I am not sure what to do.
Thanks.