pukar12345
Electrical
- Mar 28, 2010
- 27
Dear All,
I saw 145kV transmission system where switching of shunt capacitor is done by three induvidual pole circuit breaker replacing three pole ganged circuit breaker. What is the main reason behind this ?
in my opinion, main purpose is that when one phase of capacitor gets fault at that time only one phase trips and remaining two will be available in the system.
Am i right ? or please correct me.
Thanks for all in advance.
I saw 145kV transmission system where switching of shunt capacitor is done by three induvidual pole circuit breaker replacing three pole ganged circuit breaker. What is the main reason behind this ?
in my opinion, main purpose is that when one phase of capacitor gets fault at that time only one phase trips and remaining two will be available in the system.
Am i right ? or please correct me.
Thanks for all in advance.