Nov 1, 2010 #1 JSplanner Civil/Environmental Joined Nov 1, 2010 Messages 1 Location US All Milestone activities in the schedule are not calulating the Positive Float. The float column either shows the 0 float or the Negative Float but calculates/shows the Positive Float as 0. Please assist.
All Milestone activities in the schedule are not calulating the Positive Float. The float column either shows the 0 float or the Negative Float but calculates/shows the Positive Float as 0. Please assist.