SOFLENG
Geotechnical
- Dec 19, 2008
- 7
I am designing a continuous deadman anchor for a sheet pile bulkhead. There is a 20' high MSE wall embankment 37' inboard of my anchor wall. I do not believe the embankment is influencing the anchor wall (pushing in the wrong direction) but I need to proove it. Using classical strip load analysis, I still wind up with 350 psf at the bottom of the anchor 10' down. Any thoughts on how to analyze this?