The situation is, we have a beam that was designed using steel rebars, however, due to additional loadings as per client's request, we are now facing a dilemna.We are using high strength concrete (50Mpa), and our beam size is already controlled, so we cannot change our sizes already. Due to the additional loads, our beam cannot withstand the new Moment. Adding rebars is not a solution too since it is still failing, so we decided to use FRP. The problem is, we were able to satisfy the moment capacity, but we are over reinforced already. We are using ACI 440.Thanks.