Just doing a preliminary budget estimate, I will look this up in my cost data book, but thought I'd like to see if some "real world" numbers will turn out close. We don't design many of these, so we will be outsourcing the detailed design when we get to that point, but thought that some of you whom do this regularly would have a feel for a rough cost for one of these, (equipment only?-installed cost?).
We have a 34.5kV primary, 480y/277V, secondary, 3.75mVA indoor, oil filled substation with a 500A, secondary bus duct flange section and a primary fused switch.
Any ball park ideas in $US?