ash060
Structural
- Nov 16, 2006
- 473
I am working on a project that has a first floor slab supported on concrete piles. The soil is all muck underneath. How are conduits and piping typically supported in this case. I was thinking of hanging a duct bank under the slab, but I am not sure. Also, what is the method of construction for these slabs? Do they use stay-in-place forms for the slab soffit or something else.
Lastly, for vapor protection do you cover the soil with visqueen or do something else.