Feb 25, 2013 #1 GeoSoil Geotechnical Joined May 5, 2012 Messages 5 Location US Is there an AASHTO spec for the steel soldier pile sacrificial thickness when the design life is 100 years vs, 75 years? This pertains to a cantilvered sldier pile and lagging retaining wall.
Is there an AASHTO spec for the steel soldier pile sacrificial thickness when the design life is 100 years vs, 75 years? This pertains to a cantilvered sldier pile and lagging retaining wall.