Ben29
Structural
- Aug 7, 2014
- 326
Please see attached sketch. I want to make the tube steel moment connected at all joints. Is this even possible given the steel size and configuration? Should I just say "provide full moment connection at flange and web" and let the steel detailer figure it out? I don't want to show a connection that isn't possible. Thanks for your help.