BearcatEngineer
Structural
- Mar 18, 2005
- 16
Our geotech expert has taken another position and hard to get a hold of. He recommended that a geotech expert be in contact if the soil report shows standard penetration values less than 10 blows/ft. What should we be doing on these areas of the site to work around or correct this problem. There will be a wall and column foundations as well as traffic and parking potential.