A soil plug has developed in a 3 foot diameter pipe while driving into 6 inch minus rock fill. Top of plug is approximately 20 feet from grade; so it could potentially be possible to fill with reinforcement and concrete infill and be well below the the depth of fixity. As long as the PDA results indicate that the axial capacity of the pile is acceptable, then the soil plug will likely remain and concrete in-fill will be placed above. However, if need be, would it be practical/possible to excavate and remove the rockfill inside the steel pipe pile?