pileexpert
Geotechnical
- Aug 17, 2012
- 13
Hi everyone esp. Mr. PEinc who i've learned very much from him
My question is that a contractor has performed soil nailing in a slurry soil which water level is very high. they have done 4m but they want to go down to 20m but i dont think they can do that, could you please tell me what is the best solution for this situation?
thanks
My question is that a contractor has performed soil nailing in a slurry soil which water level is very high. they have done 4m but they want to go down to 20m but i dont think they can do that, could you please tell me what is the best solution for this situation?
thanks