ok... so i'm asked to look at a tank to give a design for a manway addition to an existing tank. When we got there, we found out that
1. the tank was an excavated UST that has been empty for a while and now they want to use it to hold acetone and other flammable solvents with high vapor pressures.
2. they don't plan on venting it.
3. the tank has a massive dent on one side (probably from the excavation).
i don't mess around with pressure vessels so i can't say much about it, but i feel like they will be wasting their time with this tank if they won't vent it. any advice? have you crossed this before?
1. the tank was an excavated UST that has been empty for a while and now they want to use it to hold acetone and other flammable solvents with high vapor pressures.
2. they don't plan on venting it.
3. the tank has a massive dent on one side (probably from the excavation).
i don't mess around with pressure vessels so i can't say much about it, but i feel like they will be wasting their time with this tank if they won't vent it. any advice? have you crossed this before?