Hi Everybody,
I am looking for any reference to prevent my slab on grade damage due to "heavy dozer/loader tracks".
I have heard of embedding steel rails/beams into the floor to prevent the damage but do not have any reference or details for this.
Is there any structural issue with rail embedded into slab on grade?
The slab on grade is for repair shop for heavy mining trucks/loader etc. with metal tracks.
Thanks
I am looking for any reference to prevent my slab on grade damage due to "heavy dozer/loader tracks".
I have heard of embedding steel rails/beams into the floor to prevent the damage but do not have any reference or details for this.
Is there any structural issue with rail embedded into slab on grade?
The slab on grade is for repair shop for heavy mining trucks/loader etc. with metal tracks.
Thanks