braceh
Structural
- Jul 21, 2009
- 10
On my job I have skewed shear plates connecting to embed plates. There are 2 skeed connections and 1 transverse connection all occurring at roughly the same location. At this congested point could a fillet weld on either side of the skewed shear plate take place of a partial joint penetration weld of equal size. Reason being is that the 1 transverse (90 degree angle) connection has already been welded into place and the 2 skewed joints ( if facing north, 1 going north-west and the other going north-east) are being welded after the fact. Any help would be appreciated.