johnhan76
Civil/Environmental
- May 16, 2002
- 123
This is how I set finish floors in residential subdivisions- I am wondering if this is what everyone else is doing.
1. Draw house.
2. Find highest contour line that intersects house.
3. Add 2' to this to determine minimum finish floor elev.
4. Make sure that this is 1.5' higher than road if the drainage is going towards the road.
5. Make sure that I can get the sewage to the main.
6. Make sure it is 1' above flood stage.
Thanks
1. Draw house.
2. Find highest contour line that intersects house.
3. Add 2' to this to determine minimum finish floor elev.
4. Make sure that this is 1.5' higher than road if the drainage is going towards the road.
5. Make sure that I can get the sewage to the main.
6. Make sure it is 1' above flood stage.
Thanks