Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations MintJulep on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Septic System Installation - Contractor/Engineer relationship

Status
Not open for further replies.

russiangoat

Chemical
Joined
Sep 14, 2004
Messages
14
Location
CA
Hello,

I am putting together a short presentation for septic system installers. The basic focus of the presentation is ways that the contractor can ensure a smooth working relationship with the engineer. I am looking for common generic problems encountered by engineers when working with contractors (specifically septic system installers, but many problems will be common).

Examples of types of problems I am looking for:
1) Ensure that you (the contractor) are using the final for construction drawings, and not a previous (superceded) drawing set.
2) Notify the engineer in advance of installing anything requiring inspection, otherwise it will have to be dug up to be inspected.
3) Let the engineer know of any discrepancies in drawings/specs as soon as possible.

Any suggestions would be appreciated!
 
In Minnesota the township has an inspector for the installation and the State has licensed only certain persons as installers. No engineer involved for normal septic systems.

Richard A. Cornelius, P.E.
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top