FSS
Structural
- Sep 24, 1999
- 270
I have been doing some wind/seismic calculations for relatively light structures. The wind forces are much higher than the seismic forces in this case due to site locations.
When using the equivalent lateral force procedure I come up with basically a percentage of the weight to use as my base shear. In the high-seismic areas, how high can this percentage get? Just wondering what would be the all-out worst case? 50%? I deal with seismic on such an infrequent basis that I don't have a good feel for the numbers.
When using the equivalent lateral force procedure I come up with basically a percentage of the weight to use as my base shear. In the high-seismic areas, how high can this percentage get? Just wondering what would be the all-out worst case? 50%? I deal with seismic on such an infrequent basis that I don't have a good feel for the numbers.