AUCE98
Structural
- Nov 24, 2004
- 127
I am putting together a proposal for a project that will require SCBF's. Does anyone have a good feel for the amount of additional time that would be required for design / detailing (as a percentage of total engineering cost) as opposed to a project with R=3 ?