A collegue came to me with a question regarding sanitary force main construction. They are designing an 8" main from a lift station. Along the way, the force main dips into a low spot then climbs back out towards it's destination. He asked if any provisions for sediment accumulation at the low spot should be made.
We both got a laugh at the thought of installing a blow off valve at the low spot.
I don't think any provisions are needed. It would be cost prohibitive to transition to gravity, then another pump station at the low spot.
I thought I would check here and see if anyone has an opinion.