This particular area was difficult during the initial construction. Unfortunately, a lot of rock is available and the late Winter/early Spring sees a lot of this.
This is several hundred feet to the west of the tunnel. In one location you can see the end of the median divider. This location allows for enough room to shift traffic between EB and WB lanes.
This link shows the west end of the tunnel. In the pic of the hanging Lake Tunnel, you can see the electric sign and the crossover. This is the exact area of the slide.