EBWhite224
Chemical
- Mar 28, 2011
- 1
We are about to move into a new facility and need to run a natural gas line to the building. There was a line that previously ran past the building but it has not been used since the 1980's. I am wondering if we can reuse this existing pipeline and tie into it to run to our building or if we have to lay a new one down.
Thanks
Thanks