dik
Structural
- Apr 13, 2001
- 26,095
The following is a copy of an eMail sent to the professional association in Manitoba:
A set of documents have been prepared and sealed by an Engineer (orignial engineer). The client wants this original set of documents revised and the client also wants the revised drawings to be issued under seal.
If the documents are re-sealed by a new engineer, is the new engineer responsible for the information contained in the documents or only for the changes to the original documents sealed by the original engineer?
Do you have any clarification to the responsibility of the new engineer?
thanks, Dik
any thoughts about responsibility?
Dik
A set of documents have been prepared and sealed by an Engineer (orignial engineer). The client wants this original set of documents revised and the client also wants the revised drawings to be issued under seal.
If the documents are re-sealed by a new engineer, is the new engineer responsible for the information contained in the documents or only for the changes to the original documents sealed by the original engineer?
Do you have any clarification to the responsibility of the new engineer?
thanks, Dik
any thoughts about responsibility?
Dik