I'm a novice at PLC hardware requirements and am looking over a proposed plan. We have a large plant, with a central control room. We want to bring in field data from various switches. The proposal includes 50 remote I/O racks and three PLCs.
I guess all the field devices wire to the remote I/O racks located strategically in the field? Exactly what is in a remote I/O rack?
And how do you get from the remote I/O (multiconductor cable? fiber?) to the the PLC, where I suppose the processor is located?
I guess all the field devices wire to the remote I/O racks located strategically in the field? Exactly what is in a remote I/O rack?